| NO. |
TITLE OF PROJECT |
LOCATION |
SCOPE OF WORK |
PROJECT OWNER |
CONTRACT NO. |
PROJECT PERIOD |
|
LIST OF COMPANY EXPERIENCES BY SCOPE OF WORK |
| EXPERIENCES IN
BUILDING. |
| A. |
Design (DS), Supervision (SP), Construction Management (CM), Quantity
Surveying (QS) & Mechanical Electric (ME). |
| 1 |
Capex Pasundan 3 Design Mezanine, Catwalk & Convenyor (Design Mezanine ULI) |
Jababeka |
DS |
PT. Uniliver Indonesia Tbk
Graha Uniliver, Green Office Park Kav3. Jl BSD Boulevard Barat, BSD City -
Tangerang | PO15075518
31 Desember 2023 | Feb'24 |
| 2 |
Jasa Detail Engineering Design ("DED") Proyek Club House dan Auditorium |
|
DS |
Ceria Metalindo Prima
South Quarter Tower Jl. RA Kartini Kav.8 Cilandak Jakarta |
CMP-DOK.KOK-COS-15.O.IX.2023-17
20 September 2023 | Jan'24 |
| 3 |
Jasa Consultan Engineering Service
(warehouse - indowine) |
Bali |
DS |
PT Tri Hita Citra Persada
Br. Auman, Ds. Palaga Kec. Petang Badung Bali | P0019
14 September 2023 | Nov'23 |
| 4 |
Jasa Konsultan Pengawasan Pekerjaan Penggantian Peralatan Electronic
Security System di 3 (Tiga) Gedung Kantor Perwakilan Bank Indonesia
Dalam Negeri (Kantor Perwakilan Bank Indonesia Provinsi Maluku Utara,
Provinsi D.I Yogyakarta dan Pematangsiantar) |
KPwBI Provinsi Maluku Utara, Privinsi D.I Yogyakarta dan Pematangsiantar |
SP & ME |
Bank Indonesia
Jl. M.H. Thamrin No. 2 | 25/409/DPS/P/B
18 Juli 2023 | Jul'25 |
| 5 |
Kajian Hydrologi Cibitung |
Cibitung |
DS |
PT. Indo Swissatama
Jl. Minangkabau No.20 Jakarta Selatan 12970 | 007/SPK/APP
Cibitung/ISA-DDS/XI/22 | Apr'23 |
| 6 |
Manajemen Konstruksi Pekerjaan Pembangunan Office PT Huntsman Indonesia
(Civil Consultant for Sample Room) |
Jakarta Timur |
DS & CM |
PT. Huntsman Indonesia
Jl. Raya Bogor KM 27.3 | PO 9000078972
13 Oktober 2022 | Jna'23 |
| 7 |
Jasa Manajemen Konstruksi dan Jasa Konsultan QS Pembangunan RS IMC (Lanjutan) |
Tangerang |
DS & CM |
PT. Graha Mekatama Telindo
Ruko Bintaro 8 Blok L-M
Jl. Jombang Raya No. 8 | 2020/GMT/PO002
24 Juni 2020 | Feb'21 |
| 8 |
Design Review & Construction Management Office PT Huntsman Indonesia
(Design dan Pengawasan) |
Jakarta Timur |
DS & CM |
PT Huntsman Indonesia
Jl. Raya Bogor Km 27.3 | PO 9000008868
11 Februari 2020 | Jun'20 |
| 9 |
Manajemen Konstruksi Pembangunan Bandar Udara Mentawai Baru |
Mentawai |
DS & CM |
Kementerian Perhubungan
Jl. Poros Tua Pejat - Sioban | 02/KONTRAK/BUMB-SBSN/MK/XII/2020
7 Desember 2020 | Jan'23 |
| 10 |
Managemen Konstruksi Pembuatan Paralel dan Right Angle Taxiway Bandar
Udara APT Pranoto |
Samarinda |
Sipil |
Kementerian Perhubungan
Jl. Poros Samarinda - Kaltim | KU.003/0006/MK-SBSN/APTP/2021
5 April 2021 | Jan'22 |
| 11 |
Project Preparation Consultant (PPC) Firm for Development of The Saddang
Irrigation System In South Sulawesi (Loan No.3)455-INO |
Sulawesi Selatan |
DS |
Direktorat Irigasi dan Dataran Rendah, Direktorat Jenderal Sumber Daya Air,
Kementerian Pekerjaan Umum dan Perumahan
Jalan Patimura No.20 | (Loan No.3)455-INO Contract No.
KU.02.10/Ai/III/13 | Feb'21 |
| 12 |
Project Preparation Consultant (PPC) Firm for Development of Masterplan of
Suntainable Raw Water Supply System (Loan No.3455-INO ) |
Indonesia |
DS |
Direktorat Irigasi dan Dataran Rendah, Direktorat Jenderal Sumber Daya Air,
Kementerian Pekerjaan Umum dan Perumahan
Jalan Patimura No.20 | (Loan No.3)455-INO Contract No.
KU.02.10/Ai/III/13 | Des'20 |
| 13 |
Jasa Konsultan Manajemen Konstruksi Pekerjaan Overlay RunwayUntuk
Peningkatan Daya Dukung Di Bandara Internasional Minangkabau |
Padang |
CM & ME |
PT. Angkasa Pura II (Persero)
Jl. MR. Sutan M. Rasyid, Padang Pariaman |
PJJ.06.02/06/09/2018/0040. 14 Sep 18
PJJ.06.02/06/02/2020/0011. 27 Feb 20
PJJ.06.02/06/08/2020/0155. 14 Aug 20
| Jul'23 |
| 14 |
Konsultan Manajemen Konstruksi Pekerjaan Pengembangan Fasilitas Bandara
Banyuwangi |
Banyuwangi |
CM & ME |
PT. Angkasa Pura II (Persero)
Gd. Basecamp Airport Construction Divisi Jl. M-1 Bandara Soeta |
PJJ.14.09/00/04/2018/0116. 13 Apr 18
PJJ.14.09/00/04/2020/0661. 9 Apr 20 | Mar'21 |
| 15 |
Manajemen Konstruksi Penyempurnaan Area Kedatangan dan Area Parkir
Terminal 3 Bandara Soekarno - Hatta |
Tangerang |
CM,AR
& ME |
PT. Angkasa Pura II (Persero)
Gd. Basecamp Airport Construction Divisi Jl. M-1 Bandara Soeta |
PJJ.14.10/00/01/2018/0019. 16 Jan 18
Add 1: PJJ.14.10/00/03/2019/0951. 1 Mar 19
Add2 : PJJ.14.10/00/10/2019/1210. 3 Okt 19
Add3 : PJJ.14.10/00/06/2020/1281. 22 Jun 20
Add4 : PJJ.14.10/00/01/2021/A.0814. 29 Jan 21 | Nov'21 |
| 16 |
FS SPAM Jatiluhur Tahap I 5000 lpd |
Bekasi dan Karawang |
DS |
Konsorsium Jakon, Wika, TGR
Jln. Sultan Syahri SCBD Bintaro | Jakon No.10/PD/JK/SK/VI/2017
, WIKA No.T.P.01.03/J.DEP.INV.0567/2017 TGR No.15/PKS/SPAM-JT/TGR/VI/2017 |
Jun'19 |
| 17 |
Konsultan Manajemen Konstruksi Proyek The Noble Apartement Alam Sutera |
Tangerang |
CM, AR
& ME |
PT Datzo Investama Group
Tangerang | DIG/Spem-002/Dir/X/2017
23 Oktober 2017 | Aug 20 |
| 18 |
Jasa Konsultan Manajemen Konstruksi Pekerjaan Pelebaran dan Overlay Jalan
Masuk Bandara, Pembuatan Pagar Daerah Keamanan Terbatas (DKT) Tahap 2,
Pembangunan Perluasan apron Bandara International Minangkabau, Pelapisan
Permukaan Perpanjangan Runway 015 Di Bandara International Minangkabau |
Padang |
CM, AR
& ME |
PT Angkasa Pura II
Jl. MR. Sutan M. Rasyid, Padang Pariaman |
PJJ.04.04.01/06/06/2017/0782. 2 Jun 17
Add 1 :PJJ.06.02/06/11/2018/0072. 9 Nov 18
Add 2 :PJJ.06.02/06/03/2019/0067. 12 Mar 19 | Mar'23 |
| 19 |
Konsultan Manajemen Konstruksi East Connection Taxiway NP1-SP1 (Tahap 1)
Bandara Soekarno - hatta |
Tangerang |
CM & ME |
PT. Angkasa Pura II (Persero)
Gd 600 Bandara Soekarno Hatta |
PJJ.14.09/00/07/2014/477. 15 Jul 14
Add 1 : PJJ.14.09/00.02/02/2017/0051.
28 Feb 18
Add 2 : PJJ.14.09/00/01/2018/1309
26 Januari 2018
Add 3 : PJJ.14.09/00/07/2019/0950
15 Juli 2019 | Jun'20 |
| 20 |
Perencanaan Penanganan Tanah Longsor di PT Komatsu Remanufacturing Asia |
Balikpapan |
DS |
PT Komatsu Remanufacturing Asia | 035/KRA/PKS/V/108, 21
Mei 2018 | Mei' 18
Jun' 18 |
| 21 |
Perencanaan Aksesbilitas Area Komersil Bandara Soekarno - Hatta. (Jalan dan
Jembatan) | Banten |
DS |
PT Angkasa Pura II
(Persero) | PJJ.14.09/00/01/2018/0046
25 Januari 2018 | Jan' 18
Jul' 18 |
| 22 |
Penyusunan Rencana Umum Pembangunan Terminal Khusus PT Ceria Nugraha
Indotama |
Sulawesi Tenggara |
DS |
PT Ceria Nugraha Indotama | 009/CNI-DDS/III/2018
14 Maret 2018 | Apr' 18
May' 18 |
| 23 | Perencanaan dan Pengawasan
Konstruksi Pada Proyek Distribution Center Super Indo di Mojokerto
(Termasuk Perencanaan Jalan) |
Mojokerto | DS & SP |
PT Lion Superindo | 232/PPK-LGL/X/15
11 Februari 2016 | Feb' 16
Feb' 17 |
| 24 |
Project Engineer for Bentorl ASMO |
Jakarta |
DS & SP |
PT Bentoel Distribusi Utama |
085/P-MKT/CLG-JKT/BDU/IV/2016
9 Juni 2016 |
Aug' 16
Aug' 16 |
| 25 |
Architectural, Structure and Civil Design Modification on Huntsman Gandarai
Site (Termasuk Jalan dan Jembatan) |
Jakarta |
DS |
PT Huntsman |
PO 4400603832
28 Juni 2016 |
Aug' 16
Aug' 16 |
| 26 |
Perencanaan Perbaikan Lantai di DC Cikarang |
Cikarang |
DS |
PT Lion Superindo |
079/PPK-LGL/II/16
11 Februari 2016 |
Apr' 16
Apr' 16 |
| 27 |
Analisa Struktur Bangunan Lantai dan Penyelidikan Tanah |
Gunung Putri |
DS |
PT Lion Superindo |
080/PKK-LGL/II/16
11 Februari 2016 |
Mar' 16
Mar' 16 |
| 28 |
Design ACS Project LEGO New Sonolator dan Soap Making (Termasuk
Perencanaan Jalan) |
Cikarang |
DS |
PT Unilever Indonesia |
DO9676671
23 Februari 2016 |
Mar' 16
Mar' 16 |
| 29 |
Design Structure Project FxF |
Cikarang |
DS |
PT Unilever Indonesia |
DO198137
14 Oktober 2015 |
Apr' 15
Apr' 16 |
| 30 |
Design of Canopy Dispatch Mega Distribution Center |
Cibitung |
DS |
PT Unilever Indonesia |
DO9503110
6 Januari 2016 |
Mar' 16
Mar' 16 |
| 31 | Evaluasi Design Struktur
Mezzanin Inbond CRMS |
Cikarang |
DS |
PT Unilever Indonesia |
DO9580940 |
Mar' 16
Mar' 16 |
| 32 | Design for Green Field Project
for E2E New Processing |
Krian |
DS |
PT Unilever Indonesia |
DO8743265
14 Juni 2015 |
Jun' 15
Mar' 16 |
| 33 |
Front End Engineering Design (FEED) for Maple Project.
(Termasuk Perencanaan Jalan dan Jembatan) |
Cikarang | DS | Jacobs |
DO9138717
29 September 2015 | Des' 15
Dec' 15 |
| 34 | Perencanaan Struktur, Arsitektur dan ME Pabrik
Minuman Desa Jambu Kec. Wangon Kb. Banyumas
(Termasuk Perencanaan Jalan) | Banyumas |
DS | PT Integra Utama |
02/05/SPK/2015 | May' 15
Aug' 15 |
| 35 | Design Proyek Banjarmasin New
Facility (termasuk perencanaan Jalan dan Jembatan) | Banjarmasin |
DS |
PT Trakindo Utama |
PO 45000020345
24 September 2014 | DEC' 14
DEC' 14 |
| 36 | Perencanaan Pembangunan New Loading 4, CNG
Plant, dan Jetty Piping Line Marunda (Termasuk Perencanaan Jalan) |
Marunda | DS | PT Smart Tbk |
Ref.300005623/MARUNDA/X/14
22 Oktober 2014 | Jan' 15
Apr' 15 |
| 37 | Perencanaan Masterplan AHEB
Cicurug (Kratingdaeng)
(Termasuk Perencanaan Jalan dan Jembatan) |
Sukabumi | DS | PT. Dwi Tunggal |
029/AHEB-CCR/DTSJ/SPK/II/14
02 Januari 2014 | Mar' 14
Mar' 14 |
| 38 | Design Arsitektur, Struktur dan MEP RSUD
Harapan Anda Pontianak Kal-Tim
(Termasuk Perencanaan Jalan) | Pontianak Kaltim |
DS | PT. Meta Estetika Graha |
035/SP/II/2014
10 Januari 2013 | Jan' 14
Jan' 14 |
| 39 | Pengkajian dan
Penyempurnaan Rancangan Pelabuhan Penajam Banua Taka Pahse 1, Kalimantan
Timur (Termasuk Perencanan Jalan dan Jembatan) |
Penajam | DS |
PT. Pelabuhan Penajam
Benua Taka |
|
Jul' 12
Jul' 12 |
| 40 | Pekerjaan Konsultansi
Perencanaan Proyek PT. Karyadibya Mahardika Pasuruan, Luas Area 15.000m2 (Termasuk
Perencanaan Jalan dan Jembatan) |
Pasuruan Jawa Timur | DS & SP |
PT. Karyadibya Maharddika |
007-096-0/UMPK/0805
15 April 2008 | Nov' 08
Nov' 08 |
| 41 | Perencanaan dan Pengawasan "Extension
Process Area & Packing Warehouse HPC Liquid Factory"
PT Unilever Indonesia Tbk | Jababeka Industrial
Estate Cikarang |
DS & CM |
PT. Unilever Indonesia Tbk | LIQ0011963000
30 Maret 2006 | Dec' 08
Dec' 08 |
| 42 | Perencanaan, Pengawasan &
Quantity Survey "BOF Extension Project NSD HPC Powder"
PT. Unilever Indonesia Tbk (Termasuk
Perencanaan Jalan dan Jembatan) |
Jakarta Industrial Estate Cikarang | DS, CM & QS |
PT. Unilever Indonesia Tbk |
JO No.SSC0002747
JO No.SSC0002755
JO No.SKJ0000081 | Jun' 08
Jun' 08 |
| 43 | Perencanaan, Pengawasan
Pembangunan Kantor 2 lt & Pabrik "Center Distribution Center" (CDC)
Extension (Proj. Pegasus) PT. Unilever Indonesia (Termasuk Perencanaan Jalan
dan Jembatan) | Jabeka Industrial Estate Cikarang |
DS & CM | PT. Unilever Indonesia Tbk. |
RMO No.HOJ000613000
6 December 2005 | Oct' 06
Oct' 06 |
| 44 | Perencanaan, Pengawasan & QS "Smalto
Chemical" Ferro Mas Dinamika - Cikarang.
Termasuk Perencanaan Jalan dan Jembatan |
Jabeka Industrial Estate Cikarang |
DS, SP & QS |
PT. Ferro Mas Dinamika | PO. No.51002350
22 November 2005 | Apr' 05
Apr' 06 |
| 45 | Perencanaan, Pengawasan & Quantity Survey "Air Pollution Control" Ferro Mas
Dinamika - Cikarang |
Jabeka Industrial Estate Cikarang |
DS & QS |
PT. Ferro Mas Diamika | PO.
No.51002027
23 September 2005 | Aug' 05
Jul' 06 |
| 46 | Perencanaan, Pengawasan & Quantity Survey
Pembangunan Kantor & Pabrik "Back of Factory Liquid Extension Project"
(Termasuk Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang |
DS, SP & QS |
PT. Unilever Indonesia Tbk | RMO. No. Liq.340300
18 Agustus 2005 | Sep' 05
Feb' 06 |
| 47 | Perencanaan, Pengawasan & QS
"Mega Mendung Learning Center Extension and Landscaping" PT. Unliver
Indonesia Tbk.
Termasuk Perencanaan Jalan dan Jembatan |
Mega Mendung
Jawa Barat | DS, CM & QS | PT.
Unilever Indonesia Tbk |
CP.2004/8/06/C
6 August 2004 | Oct' 04
Mar' 05 |
| 48 | Perencanaan & Pengawasan "Hair Movemen
Project On The Liquid Detergent Factory Extension" Luas 10.052 m2 - JIE
Cikarang
(Termasuk Perencanaan Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang | DS & CM |
PT. Unilever Indonesia Tbk | The Agreement
20 August 2003 | Sep' 03
Jan' 04 |
| 49 | Perencanaan dan Pengawasan Penambahan Kantor dan Gudang Pabrik Kecap bango -
Subang
(Termasuk perencanaan Jalan dan Jembatan) |
Subang
Jawa Barat | DS & CM |
PT. Unilever Indonesia Tbk | The Agreement
7 August 2003 | Sep' 03
Jan' 04 |
| 50 | Perencanaan & Pengawasan Pembanguna Proyek
"Liquid Detergent" Jababeka Industrilal Estate, Cikarang - Jawa Barat
(Termasuk Perencanaan Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang | DS & CM |
PT. Unliver Indonesia Tbk | The Agreement
12 July 2003 | Aug' 03
Dec' 03 |
| 51 | Perencanaan & Pengawasan Pembangunan Gedung Kantor & Pabrik "The Sariwangi
Factory Extension" (SUBMARINE Project)
(Termasuk Perencanaan Jalan dan Jembatan) |
Jababeka Industrial | DS & CM |
PT. Unilever Indonesia Tbk | The Agreement
19 December 2002 | Feb' 03
Feb' 03 |
| 52 | Perencanaan & Pengawasan "For The Sub
Mezzanine Work (APOLLO Project)", Cikarang |
Jabeka Industrial Estate Cikarang | DS & CM |
PT. Unilever Indonesia Tbk | The Agreement
16 July 2002 | Oct' 02
Oct' 02 |
| 53 | Perencanaan & Pengawasan "For The Sariwangi Tea Factory Extension (STARTREK
Project)", Cikarang
(Termasuk Perencanaan Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang | DS & CM |
PT. Unilever Indonesia
Tbk | The Agreement
25 June 2002 | Aug' 02
Aug' 02 |
| 54 | Perencanaan dan Pengawasan for Warehouse
Dsitibution Center (APOLLO Project), Cikarang.
(Termasuk Perencanaan Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang | DS & CM |
PT. Unilever Indonesia Tbk | The Agreement
4 April 2001 | Mei' 01
Jul' 02 |
| 55 | Perencanaan dan Pengawasan For The New Factory Stage 1, In Kemudo Village,
Klaten.
(Termasuk Perencanaan Jalan dan Jembatan) |
Klaten | DS & CM |
PT. Sari Husada Tbk |
The Agreement
20 November 2000 | Jan' 01
Dec' 01 |
| 56 | Perencanaan dan Pengawasan "For Packing Line
Extension Soap Factory" In Rungkut Surabaya |
Rungkut Surabaya | DS & CM | PT.
Unilever Indonesia Tbk | The Agreement
14 March 2001 | Apr' 01
Oct' 01 |
| 57 | Perencanaan dan Pengawasan "For Silo Area Modification Soap Factory" In
Rungkut Surabaya |
Rungkut Surabaya |
DS & CM | PT. Unilever Indonesia Tbk |
The Agreement
3 January 2001 | Jan' 01
Jun' 01 |
| 58 |
Perencanaan, Pengawasan & Quantity Survey "Paper Product Factor" PT. PZ.
Cussons Indonesia - Jababeka Industrial Estate, Cikarang
(Termasuk Perencanaan Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang |
DS, CM & QS |
PT. PZ Cussons Indonesia |
0.34009
18 March 2005 |
Mar' 05
Oct' 05 |
| 59 | Perencanaan & Pengawasan Teknik Pembangunan
Gedung & Pabrik "Kimberly Lever Indonesia Manufacture Facility)"
Luas 13.653m2 (Termasuk Jalan dan Jembatan). |
Jabeka Industrial Estate Cikarang |
DS & CM |
PT. Kimberly Lever Indonesia | The Agreement
27 December 2002 | Jan' 02
Jun' 05 |
| B. |
Supervision (SP). |
| 1 |
Pengadaan Pekerjaan Jasa Pengawas Renovasi Klinik Pertamina IHC Balik Papan |
Balikpapan |
SP |
PT. Pertamina Bina Medika IHC QQ Klinik Pertamina IHC |
0952/T00000/2023-S0
30 Nopember 2023 |
Mar'24 |
| 2 |
Konsultan Manajemen Konstruksi Renovasi Gedung Kantor Perwakilan Bank Kantor
Perwakilan Bank Indonesia Kepulauan Riau |
KPwBI Kepulauan |
SP |
Bank Indonesia
Jl. M.H. Thamrin No. 2 |
25/419/DPS/P/B
25 Juli 2023 |
Des'27 |
| 3 |
Construction Supervision Consultant (CSC) Phase I |
Sumatera Selatan |
SP |
Direktorat Irigasi dan Dataran Rendah, Direktorat Jenderal Sumber Daya Air,
Kementerian Pekerjaan Umum dan Perumahan.
Jalan Patimura No.20 |
KU.03.01/DIT.AM/NUWSP/15/XI/2021
17 Nopember 2021
Addendum Kontrak No.1. 11 Juli 22
Addendum Kontrak No.2. 10 Okt 22
Addendum Kontrak No.3. 19 Des 22 |
Des'22 |
| 4 |
Konsultansi Supervisi Konstruksi Realignment LRT |
Jakarta |
SP |
PT. KCIC ( Kereta Cepat Indonesia Cina) |
112/CA-4/KCIC/04.10.18
4 Oktober 2018 |
Apr'19 |
| 5 |
Pekerjaan Jasa Konsultan Pengawas Penyelesaian Renovasi 8 (Delapan) Unit
Rumah Dinas Bank Indonesia Wilayah Pasar Minggu, Jakarta |
Jakarta |
SP |
Bank Indonesia |
Nomor 22/5/DPS/P 07.
Januari 2020 |
Jul' 20 Mei' 20 |
| 6 |
Jasa Konsultan Pengawas Pekerjaan Peralatan Electronik Security System di 5
Kota Kantor Perwakilan Bank Indonesia |
Aceh, Jambi, Bengkulu, Tegal dan Purwokerto |
SP |
Bank Indonesia |
Nomor : 21/489/DPS/P.
24 Septemeber 2019 |
Sep' 19
Jan' 20 |
| 7 |
Konsultan Pengawas Pekerjaan Pembangunan di Area Bongkar Muat Batubara
Stasiun Kertapati |
Palembang |
SP |
PT Kereta Api Logistik |
0220.PJ/KALOG-DDS/2016
30 November 2016 |
Nov' 16
Apr' 17 |
| 8 | Pengawasan Pembangunan 6 Unit
Rumah Dinas Bank Indonesia | Banten |
SP |
Bank Indonesia | 18/1/DLP-GPL2/P/B
25 Januari 2016 | Dec' 16
Dec' 16 |
| 9 | Konsultan Supervisi New Part
Center | Karawang | SP |
PT Astra Honda Motor | PNPC/271/0041/2014
16 Juli 2014 | Sep' 15
apr' 16 |
| 10 | Pengawasan Project Fast
Furious 1 |
Cikarang |
SP |
PT Unilever Indonesia |
DO9569132
25 Januari 2015 |
Jan' 15
May' 16 |
| 11 | Pengawasan Pembangunan Apron dan Fasilitas
Bandara di Bandung Sultan Thaha Jambi |
Jambi | SP | PT
Angkasa Pura II Jakarta |
Kontrak. PJJ.14.09/00/12/2013/332
13 Desember 2013
Add I : PJJ.14.09/00/08/2014/188
08 Agustus 2014 | Aug' 15
Aug' 15 |
| C. |
Construction Management (CM), Quantity Surveying(QS) & Supervision
(SP). |
| 1 |
Konsultan Manajemen Konstruksi Pekerjaan Pengembangan Fasiltas Bandara
Banyuwangi |
Banyuwangi |
CM |
PT Angkasa Pura II
(Persero) | PJJ.
14.09/00/04/2018/0116
13 April 2018 |
Apr' 18
Jun' 20 |
| 2 |
Jasa Konsultan Manajemen Konstruksi Pekerjaan Pelebaran dan Overlay Jalan
Masuk Bandara, Pembuatan Pagar Daerah Keamanan Terbatas (DKT) Tahap 2,
Pembangunan Perluasan Apron Bandara International Minangkabau |
Padang |
CM |
PT Angkasa Pura II
(Persero) |
PJJ.04.04.01/06/06/2017/078
2 Juni 2017 |
Mar' 19
Mar' 19 |
| 3 |
Konsultan Manajemen Konstruksi Pada Proyek Pembangunan Gedung RS IMC Baru |
Jakarta |
CM |
PT Graha Mekatama Telindo |
06-17/PS-TNK/SPK/RSCIMC/GMT-002
8 Juni 2017 | Jul' 18
Jul' 18 |
| 4 |
Manajemen Konstruksi Penyempurnaan Area Kedatangan dan Area Parkir
Terminal-3, Bandara Soekarno - Hatta |
Tangerang Banten |
CM |
PT Angkasa Pura II
(Persero) | PJJ.14.10/00/01/2018/0019
16 Jan 2018 s/d 12 Mar 2019 | Jan' 18
Mar' 19 |
| 5 |
Pembanguna Mess Bank Indonesia Prapanca, Jalan Prapanca nomor 7, Jakarta
Selatan |
Jakarta |
CM |
Bank Indonesia | Nomor 20/194/DPS/P
04 Maret 2018 |
Mar' 18
Mar' 19 |
| 6 |
Pekerjaan Manajemen Konstruksi Pekerjaan Fixbridge, Skybridge Untuk Area
Komersial LRT dan Relayout Bangunan Gedung Terminal Penumpang di Bandara
Udara International Sultan Mahmus Badaruddin II, Palembang |
Palembang |
CM |
PT Angkasa Pura II
(Persero) |
PJJ.14.10.03/03/01/2017/004
25 Januari 2017 |
Apr' 17
Apr' 18 |
| 7 |
Manajemen Konstruksi Pengembangan Tata Pamer Museum Bank Indonesia |
Jakarta Utara |
CM |
Bank Indonesia |
60/DPA/Srt/B
5 April 2016 |
Apr' 16
Des' 16 |
| 8 |
Manejemn Konstruksi Proyek Solvolysis (Termasuk Perencaan Jalan) |
Krian |
CM |
PT Unilever Indonesia |
DO9630424
10 Februari 2016 |
Feb' 16
Sep' 16 |
| 9 | Manajemen Konstruksi Untuk Tower Project |
Malang | CM |
PT Bentoel Prima |
07/PER-CLG-MLG/BP/I/2016
13 Januari 2016 | Jan' 16
Nov' 16 |
| 10 |
Manajemen Konstruksi Connection Taxiway NP1-SP1 (Tahap 1) Bandara Soekarno -
Hatta |
Banten |
CM |
PT Angkasa Pura II |
PJJ.14.09/00/07/2014/477
15 Juli 2014 | |
| 11 | Manajemen Konstruksi Tahap 3 Surabaya Refinery
Project | Surabaya | CM |
PT Smart Tbk |
036/SMART/PKL/LGL/VIII/2014
06 Agustus 2014 | Aug' 15
Feb' 16 |
| 12 | Manjemen Konstruksi
Pembangunan Gedung Diagnostic dan Cardiac Center Tahap III RSHS Bandung |
Bandung | CM |
RSHS Bandung | PL.01.01/PPK-PNBP/2098/IV/2013
25 April 2013 | Dec' 13
Dec' 13 |
| 13 | Manajemen Konstruksi dan QS Proyek Pembangunan
SKT Tahap II Karanganyar - Solo |
Solo
Jawa Tengah | CM & QS | PT.
Prasida Inti Jaya | K00019-012/SPPK/1212/Krar
Oktober 2012 | Feb' 13
Feb' 13 |
| 14 | Manjemen Konstruksi dan QS
Proyek Pembangunan Kawasan Industri PT. Prasida Inti Jaya |
Cirebon | CM & QS |
PT. Prasida Inti Jaya | K00006-005/SPPK/1212/CRB
September 2012 | Sep' 12
Jul' 13 |
| 15 | Manajemen Konstruksi Pembanunan Gedung
Terminal Bandara Sultan Thaha - Jambi |
Jambi | CM | PT. Angkasa Pura II
Jakarta |
PJJ.14.10.03/00/01/2012
13 Januari 2012 | Jan' 12
Mei' 13 |
| 16 | Management Konstruksi
Pekerjaan Peningkatan Fasilitas Pelabuhan Penajam |
Penajam | CM | PT. Pelabuhan
Penajam
Benua Taka |
015/PPBT/CONT/VIII/2012
6 Agustus 2012 | Sep' 12
Jan' 13 |
| 17 | Manajemen Konstruksi
Pembangunan Tahap III Gedung Perawatan dan Penunjang RSUP Fatmawati |
Jakarta | CM |
Pejabat Pembuat Komitmen Non Medik RSUP Fatmawati |
PL/01.02/II.1/2370/2012
18 Juni 2012 | Jun' 12
Nov' 12 |
| 18 | Manajemen Konstruksi Pembangunan Gedung
Perawatan Asrama Mahasiswa Universitas Sriwijaya Sumatera Selatan |
Indralaya
Sumatera Selatan | CM |
Universitas Sriwijaya | 0198.i/UN9.4.2/LK/2011
31 Maret 2011 | Dec' 11
Mar' 12 |
| 19 | Manajemen Konstruksi
Pembangunan Gedung kantor Kejaksaan Tingg Sumatera Tahap III
(Gedung 10 lantai) | Palembang Sumatera Selatan |
CM | Kejaksaan Tinggi Sumatera Selatan |
B.1990/N.62/06/2012
15 Juni 2012 | Jun' 12
Dec' 12 |
| 20 | Manajemen Konstruksi Pembangunan Wisma Atlet
dan Serba Guna Provinsi Sumatera Selatan |
Plembang Sumatera Selatan | CM |
Komete Pembangunan Wisma Atlet Provinsi Sumatera Selatan |
38/SPK/KWA/2010
14 Desember 2010 | Dec' 10
Jul' 11 |
| 21 | Manajemen Konstruksi
Pembangunan Gedung CMU 2 (5 Lantai) dan Gedung CMU 3 (2 lantai)
RSUPN Dr Cipto Mangunkusuma | Jakarta |
SP, CM & QS |
RSUPN Dr. Cipto Mangukusumo | SPKM no 5416/TU.K/50.4/IV/2010
27 April 2010 | Apr' 10
Dec' 10 |
| 22 | Manajemen Konstruksi Renovasi IGD (5 lantai)
dan IRJ (5 lantai) RSUPN Dr. Cipto Mangunkusumo |
Jakarta | SP, CM & QS |
RSUPN Dr. Cipto Mangunkusumo | SPMK no 4928/TU.K/50.4/IV/2010
16 April 2010 | Apr' 10
Dec' 10 |
| 23 | Manajemen Konstruksi
Penyeleksian Pembangunan Menara 165 (lantai 9 s/d lantai 25) |
Jakarta |
SP, CM & QS |
Graha 165 |
no 01/G/165-Deserco/VIII/2010
1 Juni 2010 | Jun' 10
Dec' 10 |
| 24 | Manajemen Konstruksi Pembangunan Rusunawa - 3
(PP10-18) Gedung 5 Lantai | Yogyakarta,
Jawa Tengah,
Jawa Timur,
Kupang |
CM |
Kementrian Perumahan Rakyat Republk Indonesia Pusat Pembangunan Perumahan
Satuan Kerja Penyediaan Perumahan | KU.08.08/PK-PPPS/P2P/PP10-18/920
25 November 2010 | Dec' 10
Dec' 11 |
| 25 | Manajemen Konstruksi & Quantity Survey Pembangunan Gedung (1 lantai) Luas
6.000m2 Rumah Sakit Jakarta Eye Center, Kebon Jeruk - Jakarta |
Kebon Jeruk Jakarta |
Cm & QS |
Jakarta Eye Center | No. 01/TP-JEC/X/2008
28 Oktober 2008 | Oct' 08
Jul' 09 |
| 26 | Manajemen Konstruksi Pembangunan Perumahan 818
Unit Pasca Bencana Alam Tsunami.
Bantuan Palang Merah Canada (Village of Krueng Raya) |
Krueng Raya,
Aceh Besar NAD |
CM |
The Canadian Red Cross Society Ottawa Canada | AB/BCF/06/0002
22 April 2006
(Original)
24 Desember 2006
(Extension-1)
25 October 2007
(Extension-2)
10 June 2008
(Extension-3) | Dec' 06
Dec' 06
Oct' 07
Oct' 07
Jun' 08
Jun' 08
Jul' 09 |
| 27 | Manajemen Konstruksi Pembangunan Gedung Public
Wing dan Medical Staff (8 lantai) Luas 27.000m2, Rumah Sakit Umum Pusat dr.
Cipto Mangunkusumo.
Jl. Diponegoro - Jakarta | Jl. Diponegoro
Jakarta Pusat | CM |
Pejabat Pembuat Komitmen Belanja Barang Modal DIPA RSUPN Dr. Cipto
Mangunkusumo | 3280 TU.K/50.4/VI/2006
15 June 2006
Add I, 7503/TU.K/50.4/XII/2006
14 September 2007
Add II, 5711/TU.K/50.4/IX/2007
14 Sepetember 2007 | Sep' 08
Sep' 08
Dec' 08
Dec' 08 |
| 28 | Manajemen Konstruksi
Pembangunan RS ASRI (4 lantai), Luas 5.000m2. Jl. Duren Tiga - Jakarta |
Jl. Duren Tiga. Jakarta |
CM |
PT. Rashal Star Cakra Medika | 007/006.RSA/KJK/10/2005
21 October 2005 | Oct' 06
Oct' 06 |
| 29 | Quantity Survey RS. ASRI, Jl. Duren Tiga -
Jakarta |
Jl. Duren Tiga, Jakarta | QS |
PT. Rashal Star Cakra Medika | 006/006.RSA/QS/10/2005
21 October 2005 | Oct' 06
Oct' 06 |
| 30 | Manajemen Konstruksi Renovasi Showroom Auto 2000 Raden Intan Bandar Lampung |
Bandar Lampung |
CM |
PT Astra Int'l Tbk Toyota Sales Operation |
AI-TOYOTA/HRGA/028/SP/VI/2005
23 Mei 2005 | Oct' 05
Oct' 05 |
| 31 | Manajemen Konstruksi PembangunanKantor &
Showroom Auto 2000 Amplas - Tj. Morawa, Medan |
Tj. Mowara, Medan |
CM |
PT. Astra Int'l Tbk Toyota Sales Operation |
AI-TOYOTA/HRGA/026/SP/VI/2005
23 May 2005 | Nov' 05
Nov' 05 |
| 32 | Manajemen Konstruksi Pembangunan Gedung
Kantor (2 lantai), Pembuatan Gudang, Training Center & Workshop PT. Astra
Int'l Tbk - Jl. A. Yani Pontianak |
Pontianak |
CM |
PT. Astra Int'l Tbk | LO.PERJ/GA-006/II/05
23 Februari 2005 | Mar' 05
Oct' 05 |
| 33 | Manajemen Konstruksi Pembangunan Gedung Kantor, Gudang & Workshop - Jl. A.
Yani Palembang, Warehouse Jl. Soekarno Hatta Palembang |
Palembang |
CM |
PT Astra Int'l Tbk | LO.PERJ/GA-011/X/04
15 October 2004 | Nov' 05
Jun' 05 |
| 34 | Perencanaan & Pengawasan Teknik Pembangunan
Gedung & Pabrik "Kimberly Lever Indonesia Manufacture Facility) |
Jabeka Industrial Estate Cikarang |
DS & CM |
PT. Kimberly Lever Indonesia | The Agreement
27 December 2002 | Jan' 02
Jun' 05 |
| |
| EXPERIENCE IN
ROAD PROJECTS. |
| A. |
Construction Management (CM), Supervision (SP) &
Planning(PL). |
| 1 | Widening and Construction Work Management
Consultant Services Airport Entrance Overlay, Making of Area Security Fence
Limited (DKT) Phase 2, Airport Apron Expansion Development International
Minangkabau, Extension of Surface Coating Runway 015 at the Minangkabau
International Airport |
Minangkabau | CM | PT. Angkasa
Pura II Jakarta | PJJ.04.04.01/06/06/2017/078
2 Juni 2017 | Jun' 17 Mar'18 |
| 2 | MK Consultant for Construction of Fix
Bridge, Sky Bridge, for Area Commercial LRT and Re-layout of Terminal
Buildings Passenger At Sultan Mahmud International Airport Badaruddin II
Palembang |
Palembang | CM | PT. Angkasa Pura
II Jakarta | PJJ.14.10.03/03/01/2017/004
25 Januari 2017
Add I PJJ.14.10.03/03/12/2017/015
29 Desember 2017 | Jun' 17 Apr'18 |
| 3 | Supervision of Apron Development and Airport
Facilities at Sultan Thaha Jambi Airport |
Jambi | CM | PT. Angkasa Pura II
Jakarta | | Jul' 14
Des'15 |
| 4 | Technical Supervision of the Construction of
the Ring Roads of Bandar Jaya I and II APBNP PA1 (PW-15P) Lampung Province |
Lampung Province | SP | SNVT
P2JN Lampung Province | 20 / KTR-PW / P2JN / 2015
29 Juni 2015 | Des' 15 Des'15 |
| 5 | BTS. Road & Bridge Technical Supervision
Prov. Bengkulu - Pg. Looks, Sp. Mount Kemala - Bts. Liwa City (PW-10) |
Bengkulu Province | SP | SNVT
P2JN Lampung Province | 12 / KTR-PW / P2JN / 2015
25 Maret 2015 | Des' 15 Des'15 |
| 6 | Technical Supervision of Jalan Tegineneng-Sp
Tj Karang, Kota Agung -Rt. Tijang - Gd Tataan - Bernung (PW-07) Prov.
Lampung |
Lampung Province | SP | SNVT
P2JN Lampung Province | 07/ KTR-PW/P2JN/2014
07 Maret 2014 | Sep' 14 Sep'14 |
| 7 | Technical Supervision and Design Review for
the Improvement of the Adm-Rantau Pulung Simpang Road in East Kutai Regency |
Kabupaten Kutay | SP |
Pemerintah Kabupaten Kutai Timur Dinas PU Bidang Bina Marga |
600.057/199.a/SPJK/PWS.PJAR/DPU.BM/X/2012
17 Oktober 2012 | Oct' 14 Oct'14 |
| 8 | Construction Management of East Connection
Taxiway NP1-SP1 (Phase 1) Soekarno-Hatta Airport |
Banten | CM | PT. Angkasa Pura
II Jakarta | PJJ.14.09/00/07/2014/477
15 Juli 2014 | Jul'14 |
| 9 | Technical Supervision of Roads and Bridges
Bmt Pmt - Sp. Pematang, Sp. Pematang - Bujung Tenuk (PW-01) in Lampung
Province |
Banten | SP | SNVT P2JN
Lampung Province | 06/KTR-PW/P2JN/2013
15 Maret 2013 | Des' 13 Des'13 |
| 10 | Road and Bridge Technical Supervision
(Cross-West) Package - 11 in South Sulawesi Province |
South Sulawesi Province | SP |
SNVT P2JN Lampung Province | KU. 08.08.K.MKS/SQ050
29 Juli 2011 | Apr' 13 Apr'13 |
| 11 | Supervision of Handling of Dumai Road -
Pelintung B (Paket-26) in Riau Province |
Riau Province | SP | SNVT P2JN
Prov. Riau | HK.02.03/KTR/SNVT-P2JN/BM/2012/285
6 Agustus 2012 | Des' 12 Des'12 |
| 12 | A.P. Road Technical Supervision Pettarani
(Package 20) in South Sulawesi Province |
Sulawesi Province | SP | SNVT
P2JN Prov Sulawesi Selatan | KU.08.08/PPK-Metro/30/IV/2012
2 April 2012 | Des' 12 Des'12 |
| 13 | Engineering Supervision of Jalan Sanggi -
Bengkunat, Krui - Biha (PW-06 Package) in Lampung Province |
Lampung Province | SP | SNVT
P2JJ Lampung Province | 06/PW/KTR/PPJJ/2010
24 Maret 2010 | Des' 10 Des'10 |
| 14 | Supervision of Maintenance of North Arengka
Road Cs (Package - 16) in Riau Province |
Riau Province | SP | SNVT P2JJ
Provinsi Riau | HK.02.03/KTR.P2JJ/BM/II/16.25
Tanggal 13 Pebruari 2009 | Sep' 09 Sep'09 |
| 15 | Supervision of Road Engineering Sanggi -
Bengkunat (PW - 01) in Lampung Province |
Lampung Province | SP | SNVT
P2JJ Lampung Province | 01/PW/KTR/PPJJ/2008
05 Maret 2008 | Des' 08 Des'08 |
| 16 | Technical Supervision of Jalan Sungailiat -
Lumut (Paket-10) in Bangka Belitung Province |
Bangka Belitung Province | SP |
SNVT P2JJ Prov Babel | No. 11.PW/SP/SNVTP2JJBB/I/08
29 Januari 2008 | Aug' 08 Aug'08 |
| 17 | Supervision of Regional City District V Road
Construction Techniques (BRR - PW JR 05 Package) |
NAD Province | SP | Satker BRR
Pembinaan Perencanaan Jln NAD |
M-42/BRR-PP.889541/III/2007
30 Maret 2007 | Des' 07 Des'07 |
| 18 | Road Supervision Engineering Package - 09
Bujung Tenuk - Sp. Pematang In the Province of Lampung |
Lampung Province | SP | SNVT
P2JJ Lampung Province | 09/PW/KTR/PPJJ/2007
20 Maret 2007 | Des' 07 Des'07 |
| 19 | Supervision of Road Package Engineering - 11
Sp Sugihwaras - Baturaja and Within the City of Baturaja |
Lampung Province | SP | SNVT
P2JJ Lampung Province | 309/P.11/SNVTP2JJSS/III/2007
26 Maret 2007 | Des' 07 Des'07 |
| 20 | Supervision of Construction of Houses, Roads
and Public Bags in NAD Province |
NAD Province | SP | Canadian Red
Cross | AB / ECF / 06 / 0002
22 April 2006 | Okt' 07 Okt'07 |
| 21 | Planning and Programming for Infrastructure
Development Monitoring Data (Package II) |
NAD Province | SP | Satker - BRR
Infrastrukstur Kawasan dan Pemukiman NAD. |
S-0101/BRR.445651-PPK/XI/2006
14 Nopember 2006 | Jun' 07 Jun'07 |
| 22 | Road Supervision Engineering Package - 07 in
Jambi Province. |
Jambi Province | SP | P3JJ -
Prop Jambi | KU.08.08/W.05/P3JJ/432
13 Juni 2003 | Dec' 03 Dec'03 |
| 23 | Review Design and Contruction Supervision Of
Road and Bridge Works HSIP II - Phase IV.b Under IBRD Loan No.3712-IND.
Package BS-71 Simp. Penyandfingan - Pematang Panggang South Sumatra Province |
South Sumatera Province | SP |
Dir.Gen Of Highways/P3JJ - Sumsel |
PW.783/P3JJ-PSS-PLG/HSIP/1999
SEPTEMBER 02, 1999 | Dec' 01 Dec'01 |
| 24 | Phase IVA - Package BQ-43 Mendalo Darat -
Simpang Tuan Jambi Province |
Jambi Province | SP | Dir.Gen
Of Highways/P3JJ - Sumsel | PW.783/P3JJ-PSS-PLG/HSIP/1999
SEPTEMBER 02, 1999 | Dec' 01 Dec'01 |
| 25 | Phase IVA - Package BQ-31A Muara Bungo -
Batas Sarko Jambi Province |
Jambi Province | SP | Dir.Gen
Of Highways/P3JJ - Sumsel | PW.783/P3JJ-PSS-PLG/HSIP/1999
SEPTEMBER 02, 1999 | Dec' 01 Dec'01 |
| 26 | Review Design and Contruction Supervision Of
Road and Bridge Works HSIP II - Phase IVA Under IBRD Loan No.3712-IND,
Banjar Sari - Kayu Apuh Bengkulu Province |
Bengkulu Province | |
Dir.Gen Of Highways/P3JJ - Sumsel |
PW.783/P3JJ-PSS-PLG/HSIP/1999
SEPTEMBER 02, 1999 | Jan' 00 Jan'00 |
| 27 | Review Design and Contruction Supervision Of
Road and Bridge Works HSIP II - Phase IV Under IBRD Loan No.3712-IND (
Package BS-6 ) Bk. Kemuning - Padang Tambak Lampung Province |
Lampung Province | SP | Dir.Gen
Of Highways/P3JJ - Sumsel | PW.783/P3JJ-PSS-PLG/HSIP/1999
SEPTEMBER 02, 1999 | Jun' 99 Jun'99 |
| 28 | Review Design and Contruction Supervision Of
Road and Bridge Works HSIP II - Phase IV Under IBRD Loan No.3712-IND -
Package BS-8 & BS 9 - Jawa Barat Province |
Jawa Barat Province | PL & SP |
P3JJ - Jabar | 11 / CTR / B / LN / 1999 |
Mar' 00 Mar'00 |
| B. |
LIST OF EXPERIENCE IN ROAD PROJECT INCLUDING BUILDING. |
| 1 |
Perencanaan Aksesbilitas Area Komersil Bandara Soekarno - Hatta. (Jalan dan
Jembatan) | Banten |
DS |
PT Angkasa Pura II
(Persero) | PJJ.14.09/00/01/2018/0046
25 Januari 2018 | Jan' 18
Jul' 18 |
| 2 | Perencanaan dan Pengawasan
Konstruksi Pada Proyek Distribution Center Super Indo di Mojokerto
(Termasuk Perencanaan Jalan) |
Mojokerto | DS & SP |
PT Lion Superindo | 232/PPK-LGL/X/15
11 Februari 2016 | Feb' 16
Feb' 17 |
| 3 |
Architectural, Structure and Civil Design Modification on Huntsman Gandarai
Site (Termasuk Jalan dan Jembatan) |
Jakarta |
DS |
PT Huntsman |
PO 4400603832
28 Juni 2016 |
Aug' 16
Aug' 16 |
| 4 |
Manejemn Konstruksi Proyek Solvolysis (Termasuk Perencaan Jalan) |
Krian |
CM |
PT Unilever Indonesia |
DO9630424
10 Februari 2016 |
Feb' 16
Sep' 16 |
| 5 |
Design ACS Project LEGO New Sonolator dan Soap Making (Termasuk
Perencanaan Jalan) |
Cikarang |
DS |
PT Unilever Indonesia |
DO9676671
23 Februari 2016 |
Mar' 16
Mar' 16 |
| 6 |
Front End Engineering Design (FEED) for Maple Project.
(Termasuk Perencanaan Jalan dan Jembatan) |
Cikarang | DS | Jacobs |
DO9138717
29 September 2015 | Des' 15
Dec' 15 |
| 7 | Perencanaan Struktur, Arsitektur dan ME Pabrik
Minuman Desa Jambu Kec. Wangon Kb. Banyumas
(Termasuk Perencanaan Jalan) | Banyumas |
DS | PT Integra Utama |
02/05/SPK/2015 | May' 15
Aug' 15 |
| 8 | Perencanaan Pembangunan New Loading 4, CNG
Plant, dan Jetty Piping Line Marunda (Termasuk Perencanaan Jalan) |
Marunda | DS | PT Smart Tbk |
Ref.300005623/MARUNDA/X/14
22 Oktober 2014 | Jan' 15
Apr' 15 |
| 9 | Design Proyek Banjarmasin New
Facility (termasuk perencanaan Jalan dan Jembatan) | Banjarmasin |
DS |
PT Trakindo Utama |
PO 45000020345
24 September 2014 | DEC' 14
DEC' 14 |
| 10 | Perencanaan Masterplan AHEB
Cicurug (Kratingdaeng)
(Termasuk Perencanaan Jalan dan Jembatan) |
Sukabumi | DS | PT. Dwi Tunggal |
029/AHEB-CCR/DTSJ/SPK/II/14
02 Januari 2014 | Mar' 14
Mar' 14 |
| 11 | Design Arsitektur, Struktur dan MEP RSUD
Harapan Anda Pontianak Kal-Tim
(Termasuk Perencanaan Jalan) | Pontianak Kaltim |
DS | PT. Meta Estetika Graha |
035/SP/II/2014
10 Januari 2013 | Jan' 14
Jan' 14 |
| 12 | Pengkajian dan
Penyempurnaan Rancangan Pelabuhan Penajam Banua Taka Pahse 1, Kalimantan
Timur (Termasuk Perencanan Jalan dan Jembatan) |
Penajam | DS |
PT. Pelabuhan Penajam
Benua Taka |
|
Jul' 12
Jul' 12 |
| 13 | Pekerjaan Konsultansi
Perencanaan Proyek PT. Karyadibya Mahardika Pasuruan, Luas Area 15.000m2 (Termasuk
Perencanaan Jalan dan Jembatan) |
Pasuruan Jawa Timur | DS & SP |
PT. Karyadibya Maharddika |
007-096-0/UMPK/0805
15 April 2008 | Nov' 08
Nov' 08 |
| 14 | Perencanaan, Pengawasan &
Quantity Survey "BOF Extension Project NSD HPC Powder"
PT. Unilever Indonesia Tbk (Termasuk
Perencanaan Jalan dan Jembatan) |
Jakarta Industrial Estate Cikarang | DS, CM & QS |
PT. Unilever Indonesia Tbk |
JO No.SSC0002747
JO No.SSC0002755
JO No.SKJ0000081 | Jun' 08
Jun' 08 |
| 15 | Perencanaan, Pengawasan
Pembangunan Kantor 2 lt & Pabrik "Center Distribution Center" (CDC)
Extension (Proj. Pegasus) PT. Unilever Indonesia (Termasuk Perencanaan Jalan
dan Jembatan) | Jabeka Industrial Estate Cikarang |
DS & CM | PT. Unilever Indonesia Tbk. |
RMO No.HOJ000613000
6 December 2005 | Oct' 06
Oct' 06 |
| 16 | Perencanaan, Pengawasan & QS "Smalto
Chemical" Ferro Mas Dinamika - Cikarang.
Termasuk Perencanaan Jalan dan Jembatan |
Jabeka Industrial Estate Cikarang |
DS, SP & QS |
PT. Ferro Mas Dinamika | PO. No.51002350
22 November 2005 | Apr' 05
Apr' 06 |
| 17 | Perencanaan, Pengawasan & Quantity Survey
Pembangunan Kantor & Pabrik "Back of Factory Liquid Extension Project"
(Termasuk Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang |
DS, SP & QS |
PT. Unilever Indonesia Tbk | RMO. No. Liq.340300
18 Agustus 2005 | Sep' 05
Feb' 06 |
| 18 |
Perencanaan, Pengawasan & Quantity Survey "Paper Product Factor" PT. PZ.
Cussons Indonesia - Jababeka Industrial Estate, Cikarang
(Termasuk Perencanaan Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang |
DS, CM & QS |
PT. PZ Cussons Indonesia |
0.34009
18 March 2005 |
Mar' 05
Oct' 05 |
| 19 | Perencanaan, Pengawasan & QS
"Mega Mendung Learning Center Extension and Landscaping" PT. Unliver
Indonesia Tbk.
Termasuk Perencanaan Jalan dan Jembatan |
Mega Mendung
Jawa Barat | DS, CM & QS | PT.
Unilever Indonesia Tbk |
CP.2004/8/06/C
6 August 2004 | Oct' 04
Mar' 05 |
| 20 | Perencanaan & Pengawasan "Hair Movemen
Project On The Liquid Detergent Factory Extension" Luas 10.052 m2 - JIE
Cikarang
(Termasuk Perencanaan Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang | DS & CM |
PT. Unilever Indonesia Tbk | The Agreement
20 August 2003 | Sep' 03
Jan' 04 |
| 21 | Perencanaan dan Pengawasan Penambahan Kantor dan Gudang Pabrik Kecap bango -
Subang
(Termasuk perencanaan Jalan dan Jembatan) |
Subang
Jawa Barat | DS & CM |
PT. Unilever Indonesia Tbk | The Agreement
7 August 2003 | Sep' 03
Jan' 04 |
| 22 | Perencanaan & Pengawasan Pembanguna Proyek
"Liquid Detergent" Jababeka Industrilal Estate, Cikarang - Jawa Barat
(Termasuk Perencanaan Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang | DS & CM |
PT. Unliver Indonesia Tbk | The Agreement
12 July 2003 | Aug' 03
Dec' 03 |
| 23 | Perencanaan & Pengawasan Pembangunan Gedung Kantor & Pabrik "The Sariwangi
Factory Extension" (SUBMARINE Project)
(Termasuk Perencanaan Jalan dan Jembatan) |
Jababeka Industrial | DS & CM |
PT. Unilever Indonesia Tbk | The Agreement
19 December 2002 | Feb' 03
Feb' 03 |
| 24 | Perencanaan & Pengawasan Teknik Pembangunan
Gedung & Pabrik "Kimberly Lever Indonesia Manufacture Facility)"
Luas 13.653m2 (Termasuk Jalan dan Jembatan). |
Jabeka Industrial Estate Cikarang |
DS & CM |
PT. Kimberly Lever Indonesia | The Agreement
27 December 2002 | Jan' 02
Jun' 05 |
| 25 | Perencanaan & Pengawasan "For The Sariwangi Tea Factory Extension (STARTREK
Project)", Cikarang
(Termasuk Perencanaan Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang | DS & CM |
PT. Unilever Indonesia
Tbk | The Agreement
25 June 2002 | Aug' 02
Aug' 02 |
| 26 | Perencanaan dan Pengawasan for Warehouse
Dsitibution Center (APOLLO Project), Cikarang.
(Termasuk Perencanaan Jalan dan Jembatan) |
Jabeka Industrial Estate Cikarang | DS & CM |
PT. Unilever Indonesia Tbk | The Agreement
4 April 2001 | Mei' 01
Jul' 02 |
| 27 | Perencanaan dan Pengawasan For The New Factory Stage 1, In Kemudo Village,
Klaten.
(Termasuk Perencanaan Jalan dan Jembatan) |
Klaten | DS & CM |
PT. Sari Husada Tbk |
The Agreement
20 November 2000 | Jan' 01
Dec' 01 |